Difference between revisions of "LKPP/Proof Of Concept"

From PKC
Jump to navigation Jump to search
Tag: Manual revert
 
(22 intermediate revisions by the same user not shown)
Line 16: Line 16:
## [[Solidity]]
## [[Solidity]]
## WASM on [[Polkadot]], New version of Blockchaibn
## WASM on [[Polkadot]], New version of Blockchaibn
## RUST
## RUST, is a programming language, [https://en.wikipedia.org/wiki/Rust_(programming_language) Read the Intro to RUST]
## Libra
## [[Consortium Blockchain]]
## Consortium Blockchain,


=Deliverables=
=Deliverables=
Line 26: Line 25:
Please read below section for further description and explanation.
Please read below section for further description and explanation.
==Video Presentation==
==Video Presentation==
Reference file to develop the video script.
{{#widget:Iframe
|url=https://docs.google.com/spreadsheets/d/e/2PACX-1vTqvkUSnDEOOQAh7rgfEcaSZwg6f5Av5FjywgyKtJuLbuOHZP-Vfk0jJdjrXGPx3w2ePsHZONr39STG/pubhtml?widget=true&headers=false
|width=800
|height=640
|border=0
}}


==Working System of Concept==
==Working System of Concept==
{{:LKPP/Draft Timeline}}


=References=
=References=

Latest revision as of 06:09, 14 October 2022

Scope and Objectives

The objective of creating the Proof Of Concept deliverable are

  1. To introduce the concept Science of Governance into group of National Leaders in G20 Event [1], which will held on Bali at 16th of November.
  2. To convince Indonesia's Government to put effort incorporating implementation of the methodology and concept of Science of Governance[2]
  3. Presents how the methodology will implemented on LKPP's use case of transaction between Indonesia's Government and Local Vendor.[3]

To be effectively convey the messages to the audiences, we need to defined the root vision of LKPP's as one of the government body in Indonesia. We must put the correct opening statement, which consist the mission that has been carried by LKPP from Country Leader. The terminology should contain universal values that is relevan with every nation attended the G20.

Terminology

These are the terminology that is need to be included into the video presentation showing how to implement the Science of Governance on LKPP's operations. These are also the part of design decision on which kind on blockchain will be proposed to store the SOG's indonesia's blockchain.

  1. pBFT, practical Byzantine Fault Tolerance. This algorithm incorporated into the system is to achieve the concensus that all the Vendor in the blockchain system will put correct data into the Catalogue, which will gives back to the vendor some kind of positive appreciation. Otherwise the faulty data, presented by Vendor will have negative impact on their organization.[4]
  2. Blockchain Concensus Algorithm
    1. PoW, Proof-Of-Work. Is the original concensus algorithm in blockchain network. It will be needed to use as threshold at the network.[5]
    2. PoS, Proof-of-stake, is one of the type of blockchain, these particular type is proposed to be use as Indonesia's government blockchain.[6]
    3. dPos,NPos,TPoS, are the Consensus algorithm proposed to be use[7]
  3. Blockchain, The Kind of blockchain network proposed
    1. Solidity
    2. WASM on Polkadot, New version of Blockchaibn
    3. RUST, is a programming language, Read the Intro to RUST
    4. Consortium Blockchain

Deliverables

Two deliverable should be presented at G20 Summit, which are :

  1. Video Prensentation
  2. Working Proof of Concept

Please read below section for further description and explanation.

Video Presentation

Reference file to develop the video script.

Working System of Concept

Draft Timeline

Below is the draft of PKC Proof Of Concept Timeline, as per discussion on 18-Sep-2022

2022-09-19T07:00:00Z
2022-09-21T07:00:00Z
Find out internal and external procedure in LKPP Organization
2022-09-19T07:00:00Z
Write in all the found documentation into pkc.pub, and setup some Portal Page for LKPP Landing Page
2022-09-22T07:00:00Z
2022-09-25T07:00:00Z
In Pararel, developer team will finish the design of LKPP Blockchain system
2022-09-26T07:00:00Z
2022-10-15T07:00:00Z
Will finish blockchain smart contract with simple UI/UX
2022-10-17T07:00:00Z
2022-10-31T07:00:00Z
Wrap up with better UI/UX designed by pensieve
2022-10-31T07:00:00Z
Deadline end of October
{"selectable":false,"height":"256px","max":"2022-11-30T00:00:00Z","min":"2022-09-15T00:00:00Z"}

Functional and Specification

Below are the high-level specification that agreed upon to produce workable Proof Of Concept system

  1. Process of uploading the Product into eCatalogue [Catalogue push to blockchain]
  2. Ordering Processs of Goods and Services [Push to blockchain]
  3. Creating contract between Vendor and Government Body [Push to blockchain]
  4. Proof of order fulfillment [Push to blockchain]
  5. Payment process after fulfillment according to contract using Cryptocurrency [This one proposed by Donald's team]

The workable functional system is targeted to be done in Oct-2022, below is the workplan for delivering the workable proof of concept.

Error creating thumbnail: Unable to save thumbnail to destination

Basic Data Initialization

Processes Basic Data Initialization
Checking the availability of data input
Checking the compliance to the format/regulation/standard of data input ▪ Vendor Catalog
Bridging between the offchain database and onchain database ▪ Items Catalog
Encrypt the data according to PRC721 standard to upload to TDOS chain ▪ Quotating Catalog
Assign logic chainlink position of the data ▪ Action Documents
Output MPCs for every decisional action during the whole case

Key Process in Demo

No Player Process Action Multiple Signature MPC TPC
1 Vendor Wallet address registration
2 Vendor Wallet bonding BIN
3 Vendor Upload information on qualification documents and commodity detail
4 Auditor Audit and approve the on shelf
5 Vendor Change information (e.g Price)
6 Auditor Audit and approve the change of information on shelf
7 Planner Upload PR (list of Purchasing Request)
8 Buyer Compare and decide the commodity for PO (Purchasing Order)
9 Contractor Prepare the official PO or Contract
10 Buyer/Vendor Review and sign the PO or Contract
11 Buyer Arrange the down payment
12 Vendor Arrange the delivery
13 Buyer Receive the delivery
14 Planner Close the PR
15 Auditor Monitoring and check the order or delivery process

remark: TPC (tracable property certificate) = comination of all MPCs (Middleway property certificate) in whole case

Working Schedule for Demo

2022-09-23T07:00:00Z
2022-09-26T07:00:00Z
Demand Definition
2022-09-26T07:00:00Z
2022-09-28T07:00:00Z
Demo Interface Design
2022-09-29T07:00:00Z
2022-10-02T07:00:00Z
Smart Contract Structure and Process Design
2022-10-02T07:00:00Z
2022-10-05T07:00:00Z
Application Backend Design
2022-10-01T07:00:00Z
2022-10-09T07:00:00Z
Coding
2022-10-10T07:00:00Z
2022-10-14T07:00:00Z
Testing and Deployment
2022-10-16T07:00:00Z
Presentation
{"selectable":false,"height":"256px","max":"2022-11-30T00:00:00Z","min":"2022-09-15T00:00:00Z"}

Roadmap of LKPP on TDOS

Error creating thumbnail: Unable to save thumbnail to destination