Difference between revisions of "Accountability"

From PKC
Jump to navigation Jump to search
Line 1: Line 1:
[[Accountable]] and [[accountability]] should be grounded on information [[symmetry]] or some form of traceability of causal relations. It can be also considered as a way to perform [[abstract counting]].
[[Accountable]] and [[accountability]] should be grounded on information [[symmetry]] or some form of traceability of causal relations. It can be also considered as a way to perform [[abstract counting]].
==Accountability and Project Management==
To combine accountability with project management or time-like/process-based structures can be technically grounded in [[entropy pool]] as a way to make all projects accountable.

Revision as of 07:38, 3 September 2021

Accountable and accountability should be grounded on information symmetry or some form of traceability of causal relations. It can be also considered as a way to perform abstract counting.

Accountability and Project Management

To combine accountability with project management or time-like/process-based structures can be technically grounded in entropy pool as a way to make all projects accountable.