Success criteria
Revision as of 05:53, 4 September 2021 by Benkoo (talk | contribs) (Created page with " Every project should have relevant success criteria defined locally. On the most abstract level, the success criteria of projects in general can be defined as follows: #...")
Every project should have relevant success criteria defined locally. On the most abstract level, the success criteria of projects in general can be defined as follows:
- Soundness: A sound project should be able to demonstrate/prove its internal logical consistency.
- Precision: All activities and resources in a project are accounted for in precise measures.
- Terminable: A project should be able to reach a concluding state.