Success criteria

From PKC
Revision as of 05:53, 4 September 2021 by Benkoo (talk | contribs) (Created page with " Every project should have relevant success criteria defined locally. On the most abstract level, the success criteria of projects in general can be defined as follows: #...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Every project should have relevant success criteria defined locally. On the most abstract level, the success criteria of projects in general can be defined as follows:

  1. Soundness: A sound project should be able to demonstrate/prove its internal logical consistency.
  2. Precision: All activities and resources in a project are accounted for in precise measures.
  3. Terminable: A project should be able to reach a concluding state.